| SURFACE
PREPARATION All
surfaces should be clean, dry and free from oil or grease, dust,
dirt, loose paint or other foreign matter prior to application.
Repair all cracks and blisters. New asphalt roof surfaces should
weather a minimum of 90 days before being coated with Karnak #28
Non-Fibered Perfectseal Aluminum Roof Coating. However, Karnak #28
Non-Fibered Perfectseal Aluminum Coating can be coated on roofs
5-7 days after Karnak asphalt emulsions have been applied.
APPLICATION Karnak
#28 Non-Fibered Perfectseal Aluminum Roof Coating should be spread
uniformly over the roof surface. Care should be taken not to overwork
the coating during application. This could have a damaging effect
on the leafing of the aluminum. Pour the correct amount of aluminum
coating to cover a given area and apply uniformly.
Be sure to mechanically mix the aluminum coating thoroughly before
using. Karnak #28 Non-Fibered Perfectseal Aluminum Coating can be
applied with a soft roof brush, roller or spray.
COVERAGE Apply
at the rate of 0.5 to 1 gallon per 100 sq. ft.
CARE OF TOOLS Tools
and other equipment should be thoroughly cleaned after use with
mineral spirits, taking the necessary precautions when handling
combustible materials.
CAUTION Do
not use near open flame. Avoid breathing solvent fumes and prolonged
contact with skin. Do not take internally. If swallowed, do not
induce vomiting. Call a physician immediately. Keep out of reach
of children. Keep container covered when not in use. Do not thin.
Dispose of in an environmentally safe manner. Cover air intakes during application and while drying.
PACKAGING Available
in 5 gallon pails and 55 gallon drums.
Note: Coating Modified Bitumen Membranes with
Aluminum Coatings
Karnak recommends coating modified bitumen membranes
as soon as possible after the membrane is installed.
Karnak's experience, laboratory and field tests,
as well as NRCA, RCMA and ARMA reports, indicate that aluminum coating
will reduce the combined effects of ultraviolet rays, heat and moisture,
which, especially on APP modified bitumens, enhance exudation that
can cause discoloring and delamination of any surface coating.
COLD-PROCESS SYSTEMS AND COATINGS, EITHER EMULSION
OR SOLVENT BASED, SHOULD ONLY BE INSTALLED ON DECKS WITH POSITIVE
DRAINAGE.
PER NRCA, (NATIONAL ROOFING CONTRACTORS ASSOCIATION)
"THE CRITERIA FOR JUDGING PROPER SLOPE FOR DRAINAGE IS THAT
THERE BE NO EVIDENCE OF STANDING WATER ON THE DECK 48 HOURS AFTER
IT STOPS RAINING."
|